• MEIZHOU WEIYOU WEAR-RESISTING MATERIAL Co., LTd.
    Anna
    This is one of the best Chinese suppliers I have ever worked with. I don't need to worry about any problems after the order. I just need to wait for my goods to arrive and then check if they are damaged in transit.
  • MEIZHOU WEIYOU WEAR-RESISTING MATERIAL Co., LTd.
    Sahand
    I bought a batch of goods before, and one of them was damaged. I'm really pleased with the after-sales attitude. Jaylin re-sent it to me immediately. I'm quite satisfied with that
  • MEIZHOU WEIYOU WEAR-RESISTING MATERIAL Co., LTd.
    Nicol
    Muy profesional, entrega también es muy rápido
Contact Person : Jaylin
Phone Number : 86-13316114120
Whatsapp : +8613316114120

Excavator PC200-5 16 Holes Final Drive Cover 20Y-27-13110

Place of Origin Guangdong, China
Brand Name Weiyou
Model Number PC200-5
Minimum Order Quantity 1 Piece
Price dollar 55~100 piece
Packaging Details Standard Wooden Box for heavy parts, Strong carton for general parts, all packed with packing film
Delivery Time 5-8 work days
Payment Terms T/T,Master card,Alipay...etc.
Supply Ability 10+piece+1 day

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Name Travel Gearbox Cover Application Excavator
Gearing Arrangement Planetary Mahine Model PC200-5
Weight 23 Kg Part Number 20Y-27-13110
Model Hole Number 16 Holes Size ¢452×¢396× 43
Warranty 1 Year Processing Casting
Compatible Brand Komatsu, Other
High Light

16 Holes Final Drive Cover

,

PC200-5 Final Drive Cover

,

20Y-27-13110 Final Drive Cover

Leave a Message
Product Description

Travel Gearbox Cover PC200-5 16 Holes Final Drive Cover 20Y-27-13110

 

  The traveling outer cover is a crawler excavator traveling gear box which connects the traveling ring gear.Part used for sealing oil.Generally, there will be 1-3 oil drain holes on the outer cover to replace and maintain gear oil in the reduction gearbox at ordinary times.
  The PC200-5 walking cover is cast iron. Its part number is 20Y-27-13110. The number of holes is 16 hole, 2 oil drain holes.

 

 

Product Name:

 Travel reduction gearbox parts for PC120-5 final travel gearbox cover

 

Place of Origin:

 Guangdong, China

 

Mahine Model:

 PC200-5

 

Part Number:

 20Y-27-13110
Model:

 16 Holes,

 Outside diameter: 452
 Tube position: 396

 

Application:

 Replacement

 

Packing:

 Wooden Case

 

Brand Name:

 Weiyou

 

Delivery time:

 4 days since getting the payment,not the customized item

 

WhatsApp Number:

 +86 19867570553

 

 

PC200-5 Final Travel Gearbox Cover Pictures:

 

Excavator PC200-5 16 Holes Final Drive Cover 20Y-27-13110 0

 

 

We Can Provide Other Parts:

 

Excavator PC200-5 16 Holes Final Drive Cover 20Y-27-13110 1

 

 

Parts On Group PC200-5 Travel Device:

 

Pos. Part No Qty Parts name Comments
  20Y-27-00019 [2] FINAL DRIVE ASS'Y Komatsu China  
  20Y-27-00018 [2] FINAL DRIVE ASS'Y Komatsu China  
32 20Y-27-13110 [1] COVER Komatsu 23.4 kg.
35 20Y-27-13281 [16] BOLT Komatsu 0.31 kg.
35 20Y-27-13280 [16] BOLT Komatsu 0.31 kg.
37 07049-01215 [2] PLUG Komatsu 0.001 kg.
38 01010-51670 [18] BOLT Komatsu 0.142 kg.

 

 

WHY US:

  We have high market share in Oversea market and Domestic market, Southeast Asia 60%, Russia 10%, Middle East 8%, North and South America 10%,Europe 8%, others 4%.

 

Strength background

  We are the manufacturer and own 20000 ㎡ factory areas, good relationship with material suppliers, which make more competitive price and steady quality.

 

Technical support

  We have 16 senior engineers and more than 120 sets of advanced production equipment, with more than 30 years of design and processing experience.

Good service attitude

  Our sales term offer the efficient service for every customers. No matter the size of the trade, as long as the customer orders, our sales staff will provide efficient service.
       Support customized                    requirements   We develop spare parts for old and new excavator models, and submit our latest products to customers every month so that to meet the market demand.

 

 

FAQ

 

Q1 What is your terms of payment?
A: T/T, Paypal


Q2. What is your terms of delivery?
A:Sea ,Air ,Express


Q3. How about your delivery time?
A: Generally, it will take within 25 hours after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.


Q4. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.


Q5. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.