• MEIZHOU WEIYOU WEAR-RESISTING MATERIAL Co., LTd.
    Anna
    This is one of the best Chinese suppliers I have ever worked with. I don't need to worry about any problems after the order. I just need to wait for my goods to arrive and then check if they are damaged in transit.
  • MEIZHOU WEIYOU WEAR-RESISTING MATERIAL Co., LTd.
    Sahand
    I bought a batch of goods before, and one of them was damaged. I'm really pleased with the after-sales attitude. Jaylin re-sent it to me immediately. I'm quite satisfied with that
  • MEIZHOU WEIYOU WEAR-RESISTING MATERIAL Co., LTd.
    Nicol
    Muy profesional, entrega también es muy rápido
Contact Person : Jaylin
Phone Number : 86-13316114120
Whatsapp : +8613316114120

Hydraulic Travel Reducer Final Drive Gearbox For Daewoo DH225-9 DH225-7

Place of Origin Guangdong, China
Brand Name Weiyou
Minimum Order Quantity 1 Piece
Price dollar 990~1200 piece
Packaging Details Standard Wooden Box
Delivery Time 5-8 work days
Payment Terms T/T, T/T, L/C, Western Union, MoneyGram
Supply Ability 10 piece,1 day

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Model Number DH225-9 DH225-7 Other Name Travel Reduction Gearbox
Apply To Excavator Gearing Arrangement Planetary
Final Motor Install Hole 12-M16 Frame Install Hole 30-M16
Final Housing Install Hole 30-M16 Compatible Brand DAEWOO,
Material Cast Iron
High Light

Hydraulic Final Drive Gearbox

,

DH225-7 Final Drive Gearbox

,

Daewoo DH225-9 Final Drive Gearbox

Leave a Message
Product Description

Final Drive Gearbox DH225-9 Travel Reduction Gearbox​

Hydraulic Travel Reducer final drive gearbox For DaewooDH225-9 DH225-7

  The product is completely new and in good condition. It can also be used on DH225-9 and DH22-7 machines. The mounting holes for fitting the motor, the girder, and the final drive hub are 12-M16, 30-M16, and 30-M16.

 

Product Name:  Hydraulic Travel Reducer For DH225-9 Travel Gearbox
Applicable Industries:  Manufacturing Plant, Machinery Repair Shops, Other
Place of Origin:  Guangdong, China
Gearing Arrangement:  Planetary
Application:  Excavator
Machine model:  DH225-9
Final Motor Install Hole:  12-M16
Frame Install Hole:  30-M16
Final Housing Install Hole:​  30-M16
Compatible Brand:  DAEWOO
Warranty:  6 months
Packing:  Wooden Case
MOQ:  1 Piece
Quality:  High-Quality
Customized support:  OEM
Brand Name:  Weiyou
Product name:  Hydraulic Travel Reducer Without Motor
Payment:  T/T, Alipay...etc.
Delivery time:  4 days since getting the payment, not the customized item


 

 

Travel Reduction Gearbox DH225-9 PICTURES:


Hydraulic Travel Reducer Final Drive Gearbox For Daewoo DH225-9 DH225-7 0

 

Product Parameters:

 

Hydraulic Travel Reducer Final Drive Gearbox For Daewoo DH225-9 DH225-7 1

 

Product Details:


Hydraulic Travel Reducer Final Drive Gearbox For Daewoo DH225-9 DH225-7 2

 

 

We Can Provide Other Parts:

 

Hydraulic Travel Reducer Final Drive Gearbox For Daewoo DH225-9 DH225-7 3

 

Parts On Group DH225-9 DH225-7 Travel Device:

 

Pos. Part No Qty Parts name Comments
-. K1039703B [-] TRACK ASS'Y  
16 S0565666 [60] BOLT  
21 120-00050B [60] BOLT;FLANGE  
26 2114-1816A [60] WASHER  
3 K1037757 [2] TRAVEL DEVICE 170401-00039
3 170401-00039 [2]   170401-00039A
3 170401-00039A [2] DEVICE,TRAVEL 170401-00039B
3 170401-00039B [2]    
4 K1000682 [2] SPROCKET 200108-00095
4 200108-00095 [2]   200108-00095A
4 200108-00095A [2]    

 

 

WHY US:

We have a high market share in the Oversea market and Domestic Market, Southeast Asia 60%, Russia 10%, the Middle East 8%, North and South America 10%, Europe 8%, and others 4%.

 

Strength background

 We are the manufacturer and own 20000 ㎡ factory areas, good relationship with material suppliers, which make more competitive price and steady quality.

Technical support

 We have 16 senior engineers and more than 120 sets of advanced production equipment, with more than 30 years of design and processing experience.

Good service attitude

 Our sales term offer efficient service for every customer. No matter the size of the trade, as long as the customer orders, our sales staff will provide efficient service.
    Support customized                    requirements  We develop spare parts for old and new excavator models and submit our latest products to customers every month so that to meet the market demand.

 

 

FAQ

 

Q1. What certificate do you have?
A: All our factories are ISO certificated.


Q2. How long is your delivery time?
A:
The delivery time depends on different products and quantities. The final drive usually needs about 7-15 days and the Final drive needs about 15-20 days.

Q3. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.


Q4. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.

 

Q5. What does Weiyou do?

A: Weiyou Final drive is a supplier of high-quality final drive and swing drive products including their accessories.